Power Plant Standards
The Electric and Safety Reliability Branch (ESRB) helps maintain reliable electric generation for the public by ensuring power plants comply with GO 167-B Maintenance, Operation, and Logbook Standards. GO 167-B specifies who must file compliance documents according to plant type and capacity. Unless exempt by GO 167-B, Generating Asset Owners (GAO) are required to file the following documents with the Safety and Enforcement Division.
- Maintenance Standards Filing Requirements
    
- Maintenance Plan Summary - Due February 3, 2025
 - Certification with Maintenance Standards - Due February 3, 2025
 
 - Operation Standards Filing Requirements
    
- Operation Plan Summary - Due February 2, 2026
 - Certification with Operation Standards - Due February 2, 2026
 
 - Logbook Standards Filing Requirements
    
- Thermal Logbook Verified Statement - Due February 3, 2025
 - Hydroelectric Logbook Verified Statement - Due February 3, 2025
 
 
The following table shows who must file compliance documents. For a more detailed table, download Required Filings Under GO 167-B and Other Required Duties.
| 
             FACILITY TYPE  | 
            
             CAPACITY  | 
            
             MAINTENANCE SUMMARY PLAN  | 
            
             MAINTENANCE CERTIFICATION  | 
            
             OPERATION SUMMARY PLAN  | 
            
             OPERATION CERTIFICATION  | 
            
             LOGBOOK VERIFICATION  | 
        
| 
             Any type under 50 MW  | 
            
             < 50 MW  | 
            
             Exempt  | 
            
             Exempt  | 
            
             Exempt  | 
            
             Exempt  | 
            
             Exempt  | 
        
| 
             Thermal (Fossil Fuel)  | 
            
             > 50 MW  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes  | 
        
| 
             Geothermal  | 
            
             > 50 MW  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes  | 
        
| 
             Hydroelectric  | 
            
             > 50 MW*  | 
            
             Yes**  | 
            
             Yes**  | 
            
             Yes**  | 
            
             Yes**  | 
            
             Yes  | 
        
| 
             Wind  | 
            
             > 50 MW  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes  | 
            
             Exempt  | 
        
| 
             Solar  | 
            
             > 50 MW  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes***  | 
        
| 
             New or Acquired Plant  | 
            
             > 50 MW  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes  | 
            
             Yes  | 
        
- * includes switching centers controlling > 50 MW
 - **unless licensed by FERC
 - *** for solar thermal only (photovoltaic is exempt)
 
If you have additional questions, please visit our Frequently Asked Questions (FAQ) page or contact us.
Other Filings
- Nuclear Generating Facility - Please send all filings required under GO 167-B to nuclearfilings@cpuc.ca.gov
 
The Commission has authority over the operation and safety of all non-nuclear facilities at and associated with Diablo Canyon Power Plant. The U.S. Nuclear Regulatory Commission (NRC) has exclusive authority over nuclear safety.
- Change in Long-Term Unit Status or Plant Ownership
 - Safety-Related Incident
 - Daily Status Report
 - NERC GADS