History

Decisions & Resolutions

Summary

D.26-07-008

Adopting Local Capacity Obligations For 2027-2029, Flexible Capacity Obligations For 2027, And Program Refinements.

Fact Sheet

 

D.25-06-048

 

Decision on Track 3 of Resource Adequacy

Fact Sheet

 

D.24-12-003

 

Decision on Track 2 of Resource Adequacy

Fact Sheet

 

D.24-06-004

 

Decision on Track 1 of Resource Adequacy

Fact Sheet

 

D.23-06-029

Decision on Phase 3 of the Resource Adequacy Implementation Track

Fact Sheet

 

D.23-04-010

Decision on Phase 2 of the Resource Adequacy Reform Track

This decision addresses issues scoped as Phase 2 of the Reform Track and adopts implementation details for the 24-hour slice-of-day framework, including adopting compliance tools, resource counting rules for various resource types, and a methodology to translate the Planning Reserve Margin to the slice-of-day framework

ED Summary

 

D.22-06-050

Decision Adopting Local Capacity Obligations for 2023 - 2025, Flexible Capacity Obligations for 2023, and Reform Track Framework
This decision adopts local capacity requirements for 2023-2025 and flexible capacity requirements for 2023 applicable to Commission jurisdictional load-serving entities. This decision also adopts the Reform Track Framework to the Resource Adequacy program. The decision includes a 24-Hour Slice Framework attached as Appendix A.

 

D.22-03-034

Decision On Phase 1 of the Implementation Track: Modifications to the Central Procurement Entity Structure
This decision completes Phase 1 of the Implementation track by adopting modifications to the central procurement entity structure adopted in Decisions (D.) 20-06-002 and D.20-12-006, including revisions to the requirements for self-shown local resources, revisions to the CPE’s solicitation selection criteria, and revisions to the CPE procurement timeline.

 

D.21-07-014

Decision on Track 3.B.2 Issues: Restructure of the Resource Adequacy Program

This decision addresses issues scoped as Track 3.B.2, which were proposals to restructure the RA program, and multi-year flexible RA requirements. The restructure proposals include consideration of hourly capacity requirements, reliance on capacity with energy attributes, use limitations, and a forward energy requirement construct.

 

D.21-06-029

 

Decision Adopting Local Capacity Obligations for 2022-2024, Adopting Flexible Capacity Obligations for 2022, and Refinements to the Resource Adequacy Program

This decision adopts local capacity requirements for 2021-2023 and flexible capacity requirements for 2021 applicable to Commission jurisdictional load-serving entities. This decision also adopts refinements to the Resource Adequacy program.

 

D.20-12-006

Decision on Track 3.A Issues: Local Capacity Requirement Reduction Compensation Mechanism and Competitive Neutrality Rules
This decision addresses issues scoped as Track 3.A., which are the local capacity requirement reduction compensation mechanism and the central procurement entity's competitive neutrality.

 

D.20-06-031

Decision Adopting Local Capacity Obligations for 2021-2023, Adopting Flexible Capacity Obligations for 2021, and Refining the Resource Adequacy Program
This decision addresses issues scoped as Track 2. Track 2 issues are those that need to be resolved earlier in the proceeding, such as adopting Local Capacity Requirements (LCR) for 2021-2023, and Flexible Capacity Requirements (FCR) for 2021. Additional issues addressed included proposals related to counting conventions that included Working Groups for hydro resources, hybrid resources, and third-party demand response resources.

 

D.20-06-002

Decision on the Central Procurement of the Resource Adequacy Program

This decision adopts implementation details for the central procurement of multi-year local Resource Adequacy procurement to begin for the 2023 compliance year in the Pacific Gas and Electric Company (PG&E) and Southern California Edison (SCE) distribution service areas, including identifying PG&E and SCE as the central procurement entities for their respective distribution service areas and adopting a hybrid central procurement framework. The decision declines to adopt a central procurement framework for the San Diego Gas and Electric distribution service area at this time.

 

Resolution No. E-4907

Requires Community Choice Aggregators to submit to a process that includes a timeline for submission of Implementation Plans; a requirement to “meet and confer” between the CCA and the incumbent utility that can be triggered by either the CCA or the utility; a registration packet including a CCA’s service agreement and bond; and a Commission authorized date to begin service.

Resolution No. E-4195

Modified the citation program adopted by Resolution No. E-4017.

Resolution No. E-4017

Approved a citation program for enforcing compliance with certain RA filing requirements.

D.20-06-031/

R.19-11-009

Adopts local capacity requirements for 2021-2023 and flexible capacity requirements for 2021 applicable to Commission jurisdictional load-serving entities. This decision also adopts refinements to the Resource Adequacy program.

D.20-06-028/

R.17-09-020

Adopts revisions to the Resource Adequacy import rules based on Energy Division's proposal, with modifications. The Commission will consider the California Independent System Operator (CAISO) and Powerex Corp.'s proposal in a subsequent Resource Adequacy proceeding after further development through the CAISO's processes.

D.20-06-002/

R.17-09-020

Adopts implementation details for the central procurement of multi-year local Resource Adequacy procurement to begin for the 2023 compliance year in the Pacific Gas and Electric Company (PG&E) and Southern California Edison (SCE) distribution service areas, including identifying PG&E and SCE as the central procurement entities for their respective distribution service areas and adopting a hybrid central procurement framework. The decision declines to adopt a central procurement framework for the San Diego Gas and Electric distribution service area at this time.

D.19-06-026/

R.17-09-020

Adopts local capacity obligations for 2020-2022, adopts flexible capacity obligations for 2020, and makes refinements to the RA program.

D.18-06-031/

R.17-09-020

Adopts flexible capacity obligations for 2019.

D.18-06-030/

R.17-09-020

Adopts local capacity obligations for 2019 and makes refinements to the RA Program.

D.17-06-027/

R.14-10-010

Adopts local and flexible capacity obligations for 2018 and makes refinements to the RA program.

D.16-06-045/ R.14-10-010

Adopts local and flexible capacity obligations for 2017 and makes refinements to the RA program.

D.15-06-063/ R.14-10-010

Adopts local and flexible capacity obligations for 2016 and makes refinements to the RA program.

D.14-06-050/ R.11-10-023

Established local procurement obligations for 2015. This decision adopts an interim “flexible capacity” framework for 2015-2017 as anticipated by D.13-06-024. This decision also defines “flexible capacity need”, adopts Qualifying Capacity and Effective Flexible Capacity for energy storage and supply-side DR resources. There are other minor RA program refinements for 2015.

D.13-06-024/ R.11-10-023

Established local procurement obligations for 2014. This decision adopts an interim “flexible capacity” framework which will be likely needed for 2015-2017 due to plant closures and less-flexible capacity.

D.12-06-025/ R.11-10-023

Established local procurement obligations for 2013. This decision studies flexible capacity proposals with an intention to issue a decision by the end of 2012. This decision also modifies the RA program to adopt a different calculation for the coincidence adjustment factor.

D.11-06-022/ R.09-10-032

Established local procurement obligations for 2012. This decision adopts eight new RA program refinements.

D.10-06-036/ R.09-10-032

Established local procurement obligations for 2011. The Qualifying Capacity Methodology Manual is adopted to provide load-serving entities with clearer direction for procuring RA resources. The RA true-up mechanism is deferred.

D.09-06-028/ R.08-01-025

Established local procurement obligations for 2010, modified certain resource counting rules, and addressed technical implementation issues.

D.08-06-031/ R.08-01-025

Established local procurement obligations for 2009, modified certain resource counting rules, and approved modifications to the compliance reporting procedure.

D.07-06-029/ R.05-12-013

Established local procurement obligations for 2008 and addressed zonal transmission constraints by adopting a “Path 26 Counting Constraint.”

D.06-12-037 R.04-04-003

In response to various petitions for modification, modified D.05-10-042 to (1) require that RA-qualified firm liquidated damages import contracts specify a delivery point at an interconnection with the CAISO control area or a CAISO scheduling point, (2) exempt certain import contracts from the requirement that RA resources be available to the CAISO in real time, and (3) make minor clarifying wording changes.

D.06-07-031/ R.05-12-013

Addressed certain RA policy issues to establish clearer expectations among market participants regarding how contracts for RA resources will count towards meeting LSEs’ procurement obligations. Adopted protocols for forced and scheduled outages and refined the definition of the essential elements of an RA capacity product that can be readily traded.

D.06-06-064/ R.05-12-013

Established local procurement obligations for 2007 based on a 2007 Local Capacity Requirements (LCR) study by the CAISO, and set the stage for establishing local procurement obligations in future years. Addressed local RA policy and implementation issues including LCR study methodology, allocation of LCRs to Commission-jurisdictional LSEs, aggregation of local areas for compliance purposes, the compliance filing process, coordination with the CAISO’s Reliability Must Run designations, market power, waivers, and penalties for non-compliance.

D.06-04-040/ R.04-04-003

In response to applications for rehearing, modified D.05-10-042 to emphasize that the RA program in place for 2006-2008 is transitional and to clarify that the MOO provision to be included in RA contracts is an independent, RA-based requirement that does not attempt to change or alter the current Federal Energy Regulatory Commission-imposed MOO.

D.06-02-007/ R.04-04-003

Removed a prohibition on reselling and re-trading import capacity rights.

D.05-10-042/ R.04-04-003

Ordered the implementation of “system” RA program beginning in June 2006 and stated intention to establish “local” RA procurement obligations beginning in 2007. Addressed several RA program implementation issues, including the nature of the RA obligation (monthly system peak), the role of the CEC in reviewing and adjusting LSE load forecasts, coordination of the RA program and CAISO operations, load forecasting and resource counting issues, standard RA contract elements, the phase-out of the ability to count non-unit specific contracts for RA showings, the “must-offer obligation” (MOO) of RA resources to be available to the CAISO, and penalties for an LSE’s failure to meet RA procurement obligations.

D.04-10-035/ R.04-04-003

Accelerated implementation of the 15% PRM requirement from January 2008 to June 2006. Provided definition and clarification regarding the RA policy framework. Key elements of the decision included load forecasting protocols, resource counting conventions, month-ahead compliance showings by LSEs in addition to year-ahead showings, and a policy that resources that qualify for RA compliance purposes should be obligated to bid into the CAISO’s day-ahead market if not scheduled by the LSE.

Proceeding

Description

Resources

R.23-10-011

 

Workshop on UCAP, Long Duration Energy Storage, and Solar & Wind Accreditation (November 3rd and 4th, 2025)

 

Workshop on Track 3 Proposals (February 12 & 13, 2025)

 

 

Workshop on Track 3 Revised LOLE Study and Price Mitigation Proposals (January 23, 2025)

 

Workshop on Track 2 Topics (July 25-26, 2024) and Office Hour on LOLE Study + PRM (August 2, 2024) in R.23-10-011

 

Track 3

 

Track 2

Workshop on Track 1 Topics (February 14 + 28, 2024)

 

Proceeding

Description

Resources

R.23-10-011

Slice of Day Implementation

 

2027 Compliance Year

 

Workshop on Slice of Day Implementation

 

Slice of Day Planning Reserve Margin Calibration Tool

 

Exceedance Analysis

 

Slice of Day Office Hours

Workshop on Slice of Day Calibration Tool and Thermal Ambient Derates

 

Workshop on LSE Showing Tool


Proceeding

Description

Resources

R.21-10-002

RA Implementation Track 3

 

RA Reform Track 2

 

RA Reform Track 2

Workshop 10 - October 6, 2022 Wrap Up

RA Reform Track 2

Workshop 9 - September 29, 2022 Test Year, Follow-up on Remaining Issues

 

RA Reform Track 2

Workshop 8 - September 21, 2022 CPUC/CAISO Processes, Flexible RA Requirements

RA Reform Track 2

Workshop Demand Response - September 16, 2022 Demand Response

RA Reform Track 2

Workshop 7 - September 14, 2022 Planning Reserve Margin Part 2

 

RA Reform Track 2

Workshop 6 - August 31, 2022 Compliance Tools

 

RA Reform Track 2

Workshop 5 - August 23, 2022 Resource Counting Recap and MCC Buckets

RA Reform Track 2

Workshop 4 - August 17, 2022 Planning Reserve Margin

RA Reform Track 2

Workshop 3 - August 10, 2022 Hybrid Resource Counting

 

RA Reform Track 2

Workshop 2 - August 3, 2022 Workstream 1: Master Resource Database, LSE Compliance Showing Tools

 

RA Reform Track 2

Workshop 1 - July 27, 2022 Resource Counting: Exceedance for Wind and Solar

Implementation Track Phase II

Implementation Track Phase I


Proceeding

Description

Resources

R.19-11-009/R.21-10

RA Reform Track

 

January 19, 2022 Track 3B2 “RA Reform” Workshop 8 – UCAP and Multi-year RA

January 5, 2022 Track 3B2 "RA Reform" Workshop 8 - Hedging

December 17, 2021 Track 3B2 "RA Reform" Workshop 7A - Energy Storage Counting

December 15, 2021 Track 3B2 "RA Reform" Workshop 7 - Recap on Slice of Day

December 1, 2021 Track 3B2 “RA Reform” Workshop 6 - Need Determination

November 17, 2021 Track 3B2 “RA Reform” Workshop 5 – Need Determination

November 3, 2021 Track 3B2 “RA Reform” Workshop 4 – Resource Counting

October 20, 2021 Track 3B2 "RA Reform" Workshop 3 - Resource Counting

October 6, 2021 Track 3B2 "RA Reform" Workshop 2 - Structural Elements

September 22, 2021 Track 3B2 "RA Reform" Workshop

February 25, 2021 Track 4 and 3.B.1 Workshop

February 8-10, 2021 Track 3.B.2 Workshops

January 8, 2021 Track 3.B.2 Forward Energy Requirements Workshop

November 24, 2020 BTM Workshop

November 23, 2020 Track 3.B Workshop - Day 2

November 18, 2020 Track 3.B Workshop - Day 1

Agenda

Presentations:

August 13, 2020 LCR Working Group

 

Proceeding

Description

Resources

R.17-09-020

November 1, 2019 Central Procurement Entity Workshop

Agenda

Presentations:

September 5-6, 2019 RA Working Groups

Agenda

Presentations:

March 12 and 13, 2019 - Track 3 Workshop

Agenda

Presentations:

March 4, 2019 - Energy Division Track 3 Proposals

July 19, 2018 - Multi-year/Single Buyer Workshop

July 12, 2018 - Energy Division Track 2 Proposals

 

February 16, 2018 - Energy Division Track 1 Staff Proposals

February 22-23, 2018 - Phase 1 Proposal Workshop

Agenda

Multi-year Requirement/Centralized Local Capacity Procurement/RA Reform

 

Options for Treatment of Late LCR/FCR Studies and Alignment of CPUC RA Hours and CAISO Availability Assessment Hours

ELCC Enhancements

Preferred RFOs

Flexible RA

CCA Load Migration

 

Local Counting for Demand Response/Use Limited Resources

 

System Load Forecast Variability

November 7, 2017 - Working group on Weather Sensitive Demand Response, Behind-the-Meter Resources and Comments on the R.17-09-020 OIR

October 23, 2017 - Working Group on Path 26, Dispatchability, and Seasonal Local Requirements


Proceeding

Description

Resources

R.14-10-010

 

February 14, 2017 - Phase 3 Proposals Workshop Day 2

Agenda

February 7, 2017 - Phase 3 Proposals Workshop Day 1

Agenda

Presentations:

Flexible Capacity

Demand Response & Storage

Implementation

December 22, 2016

December 16, 2016 - Energy Division Staff Proposals

November 9, 2016 - Workshop on Flexible Resource Adequacy

November 8, 2016 - Workshop on ELCC Methodology

October 27, 2016 - Workshop on Load Forecast Adjustment Methodology

April 5, 2016 - Workshop on Flexible Resource Adequacy

Workshop Report

Agenda

Presentations:

March 25, 2016 - Energy Division Revised RA Proposals

March 24, 2016 - Load Forecast Adjustment Webinar

Revised CEC Load Forecast Adjustment Presentation

February 18, 2016 - Workshop:

Agenda

Presentations:

February 9, 2015 - Workshop:

Agenda

Energy Staff Presentation

Party Presentations

January 6, 2015:

Energy Division releases Staff Proposal as part of the Resource Adequacy Proceeding - RA Program Refinements.